CASE-LEVEL KICKOFF · C0-001 · 2026-10-09
Reduce unnecessary waiting.真人与 e-Person 可并行接续的工作环境。
Reduce avoidable waiting—not testing, physical limits or human judgment.不要让本来没有依赖关系的事情排队;也不要把资源冲突、授权和真实验证当成可以跳过的环节。
- W01
Capture/source contract采集与来源契约
Needs: Work scope only; no hardware-demo prerequisite
Delivers: A versioned original-observation fixture / 版本化原始观察样例
- W02
Human entry & accessible explanation人类入口与可用解释
Needs: Work scope only; no hardware-demo prerequisite
Delivers: An independently readable use/handover guide / 可独立使用的说明与交接指引
- W03
Power / mounting / workspace plan供电安装与工作空间
Needs: Work scope only; no hardware-demo prerequisite
Delivers: A site/time-bound configuration and test plan / 带现场时段的配置测试计划
- W04
Driver/model compatibility驱动与模型兼容
Needs: Work scope only; no hardware-demo prerequisite
Delivers: A bounded CPU/NPU acceptance package / CPU与NPU有界验收包
- W05
Vector/RAG contract fixtures向量检索契约样例
Needs: W01
Delivers: Derived-index fixtures with source and filter tests / 来源及过滤测试样例
- W06
MCP / operation / retry contractMCP操作及重试契约
Needs: W01
Delivers: Versioned resource/tool schemas and negative tests / 版本化资源工具结构及负面测试
- W07
Supplier and local fulfillment brief供应者与现场交付简表
Needs: Work scope only; no hardware-demo prerequisite
Delivers: A non-binding offer template and availability questions / 非承诺报价模板与可用性问题
- W08
Cross-site simulated/replay integration跨现场仿真重放集成
Needs: W01, W02, W05, W06
Delivers: Labeled integration traces; no physical outcome / 带标签集成轨迹,非实体效果
- W09
Bounded physical composition test有界实体组合测试
Needs: W03, W04, W06, W07, W08
Delivers: Independent physical before/after and handover evidence / 独立实体前后及交付证据
Where parallelism is useful / 哪些可以并行
Source contracts, human instructions, fixture/workspace design, driver/model compatibility and supplier-offer preparation can start from the agreed purpose independently. Once the source contract is settled, index fixtures and protocol fixtures can be prepared in parallel. A physical composition test still waits for the relevant accepted implementations, site resources and authority.
例如 NPU 尚未推理通过时,使用说明、场所光线、供应者接口和检索数据结构可以先准备。向量化也可以先用 CPU 或重放样例验证契约;不可把这些样例升级为 NPU 实测。
Measure waiting, not only compute time / 测量等待,而不仅是算力
| Metric | Record per work |
|---|---|
| Discovery / coordination | Time to locate the correct source, contributor and version |
| Transport / queue | Transfer time, queue occupancy, retries and backpressure |
| Compute | Extraction/embedding/retrieval/model time with resource profile |
| Review / fulfillment | Human review, physical preparation and delivery time |
| Acceptance / continuation | Time to obtain evidence, reconcile exceptions and continue |
Use the longest necessary dependency path, plus real queue and recovery time, when estimating completion. No benchmark or time-saving percentage is claimed in this kickoff.
Shared-resource rules / 共享资源纪律
A camera, NPU, printer, room and human reviewer each have capacity and time windows. Parallel preparation does not imply simultaneous execution. Reserve resources with expiry, bound queues and budgets, cancel stale work and report BLOCKED with a reason. State uncertainty creates a reconciliation task, not a silent success.
Continue through HSIMC回到同一个 HSIMC 工作与现实架构
This public directory defines reference components, inputs, outputs and acceptance targets. It does not grant execution authority, bind a Runtime, create a vector database, activate an MCP endpoint, reserve a supplier or accept an order. 目录不等于已验证的整套系统;当前实例、权限、可用时间和交付均需各自证据。