{
  "schema": "hsimc.power-ready.research-same-page.v0.1",
  "artifact": "HRI-HSIMC-POWER-READY-RESEARCH-SAME-PAGE-S0-001",
  "date": "2026-10-12",
  "edition": "PUBLIC_RESEARCH_COMPILATION_NOT_APPROVAL",
  "canonical_url": "https://hsimc.tech/work/power-ready/research/",
  "title": "Power Ready · Research to Shared Reality",
  "origin_range": [
    "HSIMC · Printed Power Reality",
    "R0-001 publicly released and China supply → Hong Kong use review draft"
  ],
  "editorial_method": "Reordered reading edition; chapter wording is authored consolidation, not a verbatim transcript. Immutable attached and published data snapshots retain their bytes. Supplemental primary-source metadata checks are identified separately.",
  "chapters": [
    {
      "id": "material-first",
      "reading_order": 1,
      "title": "材料先行：重新识别即时制造的起点",
      "title_en": "Material-first manufacturing",
      "evidence_state": "HSIMC_PRINCIPLE_AND_RESEARCH_HYPOTHESIS",
      "summary_en": "A locally available factory is not sufficient if a critical material or qualified input is unavailable.",
      "markdown": "> **Global Manufacturing Readiness Begins with Material Availability, Not Factory Availability.**\n>\n> 全球即时制造就绪的起点，是可获得的材料，而不只是可调用的工厂。\n\n这条路线来自一个具体纠正：绕线已经是成熟工艺，但需要的漆包线并不是一根未经处理的铜线。问题不再只是“怎样让绕线机更便宜”，而是“图纸、人员、设备都在当地，究竟哪一种专用材料或上游工艺仍然使产品无法形成？”\n\n**漆包线的可获得性是本研究选取的依赖案例，不是已经完成249地区供货调查后的全球结论。** 其材料处理、绝缘和质量能力值得研究；专业生产门槛与某一地区买不到货必须分别取证，不能只靠推断。\n\n我们把预先绑定的功能拆开：导电能力、匝间与结构绝缘、几何成形、端部连接及可验证的绝缘系统。研究是否能利用分别取得的铜箔／铜带／铜片与合格绝缘材料，在当地形成等效功能；不以普通薄膜“暂时隔开”代替绝缘资格。\n\n| 材料路径 | 研究用途 | 需要保留的依赖 |\n|---|---|---|\n| 漆包铜线绕组 | 成熟性能和安全比较基准 | 具体规格、绝缘等级、来源及绕线验证 |\n| 铜箔＋独立绝缘薄膜 | 分离采购导体与绝缘 | 薄膜资格、边缘毛刺、层间绝缘、卷绕及接点 |\n| 裁切铜片＋层叠绝缘 | 少匝、大电流与可编程几何候选 | 裁切精度、接触电阻、绝缘、热与机械验证 |\n| 柔性 PCB／印刷绕组 | 参数化铜路径与重复制造候选 | 基材、铜厚、压合、电镀及当地PCB制造依赖 |\n\n**不能把瓶颈从专用漆包线转移到更难取得的特殊软PCB，却宣称已经实现全球即时制造。** 全球分布式制造也不要求每个地点自行制造全部芯片；当地可得、可以替代、需要预储的标准组件和不可替代依赖，都应进入同一份依赖图。\n\n传统流程“产品设计→指定材料→采购运输→制造”，在研究中扩展为“当地可得材料→可用成形与测试能力→不可变的性能／安全条件→候选实现→验收”。不同路线共享功能契约，不共享未经验证的合格标签。\n\n材料记录至少包括 Local Availability、Material Substitutability、Processing Dependency、Minimum Local Capability、Qualification Requirement，以及 **Time to First Accepted Unit**。既有建筑铜缆是正在服务的资产，不是可任意拆用的材料库存。",
      "source_ids": [
        "STD-61558-1"
      ]
    },
    {
      "id": "printed-power",
      "reading_order": 2,
      "title": "HSIMC · Printed Power Reality",
      "title_en": "Locally formable magnetic power units",
      "evidence_state": "EXPLORE_NOT_HARDWARE_ACCEPTED",
      "summary_en": "Preserve the magnetic manufacturing hypothesis without declaring a winning topology or a certified power supply.",
      "markdown": "## 从传统铁芯变压器，重新发明 GenAI 时代的可制造电力基础设施\n\n研究问题是：能否把稳定电力的形成拆成标准化磁性单元、可配置铜导体、整流／稳压／保护，以及独立的连续性能力，让电源不只是一种需要跨境运输的封装商品，而成为可在当地形成、替换和维修的能力？\n\n原讨论提出 **Magnetic Power Cell、Printed Copper Power Cartridge、Reality DC Bus、Power Reality Template**。它们仍是研究命名，不是已生产SKU，也不是宣布以工频方案取代所有开关电源。\n\n| 候选架构 | 原研究方向 | 当前边界 |\n|---|---|---|\n| A · EI铁芯＋标准初级＋铜箔次级 | 在保留经验证隔离结构的前提下研究本地次级形成 | 改动绕组或结构仍需整机重新评价；不能继承原产品所有认证 |\n| B · 全印刷绕组＋组合磁芯 | 多层软PCB、厚铜、可插接导体模块 | 工频初级匝数、窗口、绝缘和端部连接是待验证项 |\n| C · 非晶磁芯＋印刷铜模块 | 研究轻载／空载损耗与24小时运行 | 铁芯材料、处理、装配与可获得性本身也是依赖 |\n| 对照 · 高频平面磁性模块 | 保留另一条参数化制造路径 | 高频与50/60Hz方案不互相冒充；同一验收目标下比较 |\n\n铜箔卷绕、软PCB、CNC／激光裁切、层压与电镀增厚，是成形候选，不是“印刷”一词就能自动兑现的安全隔离。导体几何、机械强度与绝缘系统可以分工；不强迫每一层功能使用同一种工艺。\n\n### 保留原讨论的物理计算，明确只是条件例\n\n对正弦波工频磁性研究采用 `V_rms ≈ 4.44 × f × N × B_max × A_e`。原假设为 **50Hz、有效截面25cm²、B_max=1.2T**，得到约 **0.666V/匝**。表内为原讨论约数，不是生产绕组表；负载调整、材料、磁芯窗口、温升与绝缘均未验收。\n\n| 绕组交流额定（研究例） | 原讨论理论匝数约值 |\n|---|---|\n| 9V | 14 |\n| 24V | 36 |\n| 36V | 54 |\n| 48V | 72 |\n| 120V | 180 |\n| 230V | 345 |\n\n**工频变压器输出的是交流，不是DC稳压结果。** `48 × √2 ≈ 67.9V` 是不计损耗的峰值数量级，不等于48V DC。桥式整流与大电容负载改变绕组电流形状；Hammond原厂指南给出的电容输入全桥选型关系包含 `I_DC ≈ 0.62 × I_AC`，它是特定整流模型的设计参考，不是效率或任何电源的通用常数。[ENG-HAMMOND]\n\n因此，**300VA ≠ 自动可输出300W DC**。原讨论提出的400–500VA研究尺度、商业样品重量和调整率比较，是未绑定最终型号的设计线索，不能直接作为本项目采购规格。铁芯不自动意味着比开关电源更稳定、更节能或更便宜，结论须比较实物的满载、轻载、空载、温升、恢复与制造代价。\n\n**不断电还需要能源。** 原200W负载维持5分钟的理想能量下限为16.7Wh；实际储能还涉及转换损耗、可用容量、寿命及环境。低频磁性电力单元＋直流母线＋储能＋多源冗余是一条候选，而不是零中断保证。铁磁谐振稳压曾作为旁支提出，也不替代停电储能。\n\n### Printed Magnetic Cell P0：尚未执行的实验候选\n\n保留20–50VA级、受保护低压实验条件的原理比较构想，以同一磁芯和目标比较漆包线、铜箔＋绝缘、裁切铜片及柔性PCB。首轮关注电阻、绝缘、空载损耗、温升、调整率、重复性、材料取得时间与合格率。不提供市电初级接线或改造操作；低压实验也不证明完整电源取得安全隔离认证。\n\nIEC 61558-1、61558-2-6 是原讨论涉及的安全评价参考；本次只整理出版机构的范围／版次，不分发付费全文，不把它们说成建筑配电或每一类ICT设备的统一法规。原先提到的IEC 62368-1:2023仍列作终端产品待适用性核查项，本次未追加其全文审查。[STD-61558-1][STD-61558-COR][STD-61558-2-6]\n\n**本阶段的竞争指标：** 24小时工况损耗、故障恢复、材料与组件可得性、第一件合格产品的形成时间、本地安全验收及维修性，而不是先决定必须使用哪种变压器。",
      "source_ids": [
        "ENG-HAMMOND",
        "STD-61558-1",
        "STD-61558-COR",
        "STD-61558-2-6"
      ]
    },
    {
      "id": "functional-system",
      "reading_order": 3,
      "title": "市电至Type-C：U00–U12功能单元",
      "title_en": "Mains-to-Type-C Power Unit System",
      "evidence_state": "ARCHITECTURE_DEFINITION_CANDIDATE",
      "summary_en": "Functional units and interface contracts do not prescribe physical packaging, materials or voltage.",
      "markdown": "先确定必须形成什么能力，再分析技术路线。U00–U12是功能边界，不要求每个编号独立成一块PCB或一个外壳，也不表示按编号机械串接。\n\n| 单元 | 功能 | 必须表达 |\n| --- | --- | --- |\n| U00 | Work Power Demand／工作供电需求 | 实际负载、允许中断、后备与恢复目标 |\n| U01 | Local AC Source／当地交流来源 | 电压、频率、接地、接入与供电条件 |\n| U02 | Mains Safety Entry／市电安全入口 | 接入、过流、浪涌、触电防护及保护边界 |\n| U03 | Input Conditioning／输入处理 | 滤波、电能整形及适用时的功率因数校正 |\n| U04 | Isolation & Transformation／隔离与变换 | 危险能源隔离及所需电压／电流形成 |\n| U05 | DC Formation／直流形成 | 整流、滤波、稳压与限流 |\n| U06 | DC Power Bus／直流母线 | 分配、输送、分路保护与共享 |\n| U07 | Power Continuity／供电连续性 | 储能、备用输入、切换与维持时间 |\n| U08 | Point-of-Use Conversion／使用点变换 | 在设备附近形成所需受控直流电 |\n| U09 | USB-C Source & PD／Type-C 电源与协议 | 连接检测、协商、输出控制与保护 |\n| U10 | Cable & Connector／线缆与连接器 | 电流、压降、绝缘与必要的电子标记 |\n| U11 | Device Power Acceptance／设备电力接受 | 实际取得电力、负载行为与运行验收 |\n| U12 | Evidence & Control／证据与控制 | 来源、制造、状态、故障、权限与交付证据 |\n\nU00不在物理供电链最前端，却决定所需功率、允许中断和恢复目标。U04不预设铁芯或高频拓扑；U06不预设48V；U07在承诺一定故障范围和维持时长时成为相应的必需能力。\n\n每个单元共享五项契约：**Interface、Material、Formation、Acceptance、Continuity & Evidence**。由功能需求、材料候选、当地工艺形成经验证的实物，而不是只传一份没有材料与验证条件的BOM。\n\n| 接口 | 名称 | 契约 |\n| --- | --- | --- |\n| B01 | AC Entry | 交流接入条件与安全连接 |\n| B02 | Safe Energy Boundary | 危险能源与可接触电路的防护证据 |\n| B03 | DC Bus | 电压范围、功率、纹波、保护、切换与连接 |\n| B04 | USB-C PD Interface | 端口协商、额定、线缆能力与异常保护 |\n| B05 | Work Power Acceptance | 设备实际功率、允许中断与恢复验收 |\n\n市电形成稳定直流不等于USB-C；协议、线缆、保护与设备接受是后续独立条件。USB PD协议边界不替内部母线确定电压，也不构成全链路持续工作认证。[USB-PD]\n\n原建议的制造就绪阶段保留为：M0 Material Unknown、M1 Material Available、M2 Locally Formable、M3 Technically Accepted、M4 Authorized for Delivery。它们是材料／形成路径的候选状态，不替代HSIMC原有Runtime、Work或e-Person授权。",
      "source_ids": [
        "USB-PD",
        "STD-61558-1"
      ]
    },
    {
      "id": "building-to-work",
      "reading_order": 4,
      "title": "从大厦／小区电房，到GenAI Work",
      "title_en": "Building-to-GenAI Power Reality Infrastructure",
      "evidence_state": "ARCHITECTURE_E0_002_RETAINED",
      "summary_en": "Spatial distribution layers sit alongside functional units; installed infrastructure is not unrestricted inventory.",
      "markdown": "研究边界进一步扩展为 **Building Power Reality → Distributed Power Capability → GenAI Work Reality**。电房可能含公用事业设备，也可能仅含楼宇低压配电；层级不推定产权、具体电压、现场容量或任何进入权。\n\n| 层 | 空间／责任范围 |\n| --- | --- |\n| L0 | Utility / estate power room／电网接口与电房 |\n| L1 | Building main distribution／楼宇总配电 |\n| L2 | Floor / vertical distribution／楼层与竖向配电 |\n| L3 | Space power entry／场所电源入口 |\n| L4 | Local power formation／本地电力形成 |\n| L5 | Distribution & continuity／分配、储能与连续性 |\n| L6 | Type-C / PD delivery／Type-C／PD 电力交付 |\n| L7 | GenAI Work Reality／设备实际工作与恢复 |\n\n**L0–L7是空间与配电层级，U00–U12是功能单元。** 二者交叉表达，不替换编号、不从零重建。变压器是一种实现；铜线、保护和证据跨越多个层级。\n\n| 横向网络 | 必须回答 |\n|---|---|\n| Power Network | 电力能否在明确负载和异常条件下安全到达设备？ |\n| Material & Manufacturing Network | 哪些已有材料、制造、维修和替代能力可依法用于新能力形成？ |\n| Ownership & Authority Network | 谁拥有、运营、接入、改动、检修、计量并授权本项交付？ |\n| Runtime & Evidence Network | 能力是否形成、可寻址、可测量、可恢复、可交接？ |\n\n部署尺度保留三种：A为现有合规插座后的个人舱／空间方案；B为获授权的楼层／Shared Hub；C为建筑／小区级专业系统。**研究C不等于直接把整栋楼改为48V，也不授予A类产品进入电房施工的权利。**\n\n电源中断、楼层跳闸、电源模块故障、母线／储能失效、PD重协商与线缆脱落、设备重启和工作状态丢失，属于不同故障层。Power Available、Power Continuous和Work Continuous分别定义；不得由“有电池”推出“任务永不断”。\n\n已有建筑资料可以构成只读的Building Power Reality Map。未知上游、容量、产权与授权保持未知；不为了填满图而打开配电柜。Type-C是首个选定的终端接口，并不表示所有GenAI设备只能或都能用Type-C。",
      "source_ids": []
    },
    {
      "id": "ecosystem-contracts",
      "reading_order": 5,
      "title": "全球生态CTA与SKU／Vendor契约基础",
      "title_en": "GenAI Productive Ready · Action 01",
      "evidence_state": "PUBLIC_ARCHITECTURE_METHOD_NOT_OPERATING_DIRECTORY",
      "summary_en": "Start with power conditions and responsibilities, not a device-brand catalogue.",
      "markdown": "**Power Ready Infrastructure** 是HSIMC GenAI Productive Ready的第一个全球行动；母研究为Building-to-GenAI Power Reality Infrastructure。HSIMC继续是分布式GenAI原生能力生产基础设施，不缩减为电源设备零售商。\n\n公开CTA是 **Bring a Site or Capability｜带入场所或能力**。从工作需求及当地供电开始，不忽略负载，也不让某个品牌或手机型号定义整套系统。\n\n| 参与角色 | 范围 |\n| --- | --- |\n| SITE_HOST | Building / estate / space owner／大厦／小区／场所拥有者 |\n| ELECTRICAL_PROFESSIONAL | Registered / licensed electrical professional／注册／持牌电业专业人员 |\n| WORKS_CONTRACTOR | Electrical / construction contractor／电业承办商／施工单位 |\n| MATERIAL_MANUFACTURER | Material supplier / manufacturer／材料供应商／制造商 |\n| VENDOR_SALES_SERVICE | Vendor / store / service point／供应商／门店／销售与服务点 |\n| TESTING_INSPECTION_CERTIFICATION | Testing / inspection / certification body／检测／检验／认证机构 |\n| RESEARCH_INTEGRATION | Research / software / integration contributor／研究／软件／集成贡献者 |\n\n| 六类记录 | 分别承担什么 |\n|---|---|\n| Work Power Profile | 参考测量点、持续与峰值、允许中断、后备和恢复目标；目标与实测分开 |\n| Jurisdiction & Authority | 安装、消费、供应、制造、服务、数据处理及地方规则与具体权限 |\n| SKU／Service Contract | 精确版本、BOM／固件／材料、替代验证、额定与降额、保修与验收 |\n| Vendor Capability Contract | 法律主体、人员、实际资格／认可范围与有效期、地区及责任 |\n| Supply Offer／Sales Point | 实际卖方、地点、SKU版本、库存核对时间、报价有效性、安装及售后 |\n| Compatibility + Limits | 全供电路径×设备版本×负载×环境×试验条件→证据、局限与重测触发 |\n\n商业登记、销售资格、电业资格、实验室认可和产品认证分别记录；资质不等于进入特定电房的许可。制造、材料、安装、测试、销售、维护与监督可以分担贡献，合同再明确费用、结算、支持、分包、知识产权、变更与责任，不默认共同所有权或某方承担全部风险。\n\n兼容不是“某品牌全系列通过”。同一连接器不能证明供电、数据和Work恢复都满足。公开接受的Vendor、SKU、Offer、兼容记录仍为空；候选参与不构成上市、交易或施工批准。\n\n继续使用[原有共同Work](/work/)与[生态共建](/build/)，不另建身份、账号、交易入口或第二writer。",
      "source_ids": []
    },
    {
      "id": "baseline-gap-map",
      "reading_order": 6,
      "title": "第一项Work：供电就绪基线与缺口图",
      "title_en": "Power Readiness Baseline & Gap Map",
      "evidence_state": "PUBLIC_METHOD_SITE_UNBOUND",
      "summary_en": "An assessment can be accepted while the underlying power system still has unresolved gaps.",
      "markdown": "**W0-001**的交付不是先卖一台电源，而是以一个获授权场所、一项实际工作、一个版本化供电路径，形成有依据的现状、材料依赖、未知项与后续责任。\n\n| 交付 | 内容 |\n|---|---|\n| D01 | 场所及资料、进入、设备操作、公开各自的授权范围 |\n| D02 | 一项实际Work的负载、允许中断与恢复目标 |\n| D03 | L0–L7各层的来源、已知、未知、不可访问及边界 |\n| D04 | 材料规格／批次／地点／时效、替代与成形／测试能力 |\n| D05 | 缺口、依赖、拟承接角色、交付与验收条件 |\n| D06 | 私有评估包与去现场化公开摘要 |\n\nG01–G10分别覆盖场所授权、工作需求、地区资格路径、上游供电、末端配置、材料可得性、成形与维修、连续性验证计划、供应商业责任和报告公开分离。**这些是预置资料与组织待办，不是发现了十项现场缺陷。** 未知不等于故障、缺货或法定豁免。\n\n角色路由不等于派单；拟Vendor不等于获审核供应商；报价不等于接受；报告完成不等于供电Ready。所有真实场所、负载、资格、报价、设备／人员绑定仍须独立取证。\n\n保留两条推进线：公开架构方法先发布；真实场所评估独立接续。不可为了首发而虚构合格场所，也不必等全楼资料齐全才整理获授权的部分。\n\n[已发布方法页](/work/power-ready/baseline-gap-map/)包含六项交付和本地草稿导出。场所信息、图纸、回路、序列号、联系方式与报价不进入默认公开摘要；没有后台自动注册Work或操作电力设施。",
      "source_ids": []
    },
    {
      "id": "common-baseline",
      "reading_order": 7,
      "title": "R0-001：全球供电共同认知基线",
      "title_en": "Power Ready Common Baseline",
      "evidence_state": "PUBLIC_REFERENCE_PARTIAL_COVERAGE",
      "summary_en": "Same evidence. Explicit local differences. Traceable next Work.",
      "markdown": "**Same Page不是一套全球万能答案，而是共同事实、明确地方差异、可追溯的下一项Work。** HSIMC整理既有法源、标准、监管及供应方说明；另定义自己的描述与证据格式，不冒充当地规则制定者。\n\n参考粒度为“国家／地区→州省→城市／主管机关→供电服务区→建筑物业→具体Work”。安装地区与消费地区不能互代；国家也不一定只有一种供电制式。\n\nR0-001现有公开范围：**249个既有身份、10个共同主题、3个部分试点地区、8条条件性参考、12项来源。其余246个地区保留未研究；完整地区法律基线批准数为0。** 香港、法国含巴黎、美国限纽约市示例不是完整国家法规数据库。\n\n基础主题包括电压／频率／相制、插头与接地保护、供应文件、实施资格与权限、建筑限制、工作连续性、材料成形及交付语言。人读页面、JSON及AI Context共享版本，不能网页标待核而机器输出批准。\n\n### 三个地方例子说明为什么不能使用一个布尔结论\n\n**法国／巴黎外墙空调：** R0的官方指引参考区分外观变更、事先申报、当地规划、保护状态及共有建筑同意；不能写成France外墙空调一律禁止。城市入口提供申请路径，不是单个工程获准。[R0:FR-SP-F36778][R0:FR-PARIS-URBANISME]\n\n**香港固定装置：** 新装／增改与检查证明需分别判断。机电署指引说明WR1由有关人员与承办商在检查测试后签发、业主留存，不是所有改动都统一递交机电署。增容、具体施工与物业同意另审。[R0:HK-EMSD-WR1]\n\n**美国纽约市：** 纽约市电气许可的地方说明不能推广为全美国统一流程；具体活动和地方主管机关须显式表达。[R0:US-NYC-ELECTRICAL]\n\n这些原有来源状态在本次冻结快照中原样保留；来源的获取日期不等于法例生效日期，监管机关摘要不等于具体项目法律签署。\n\n[在线共同基线](/work/power-ready/baselines/)已经可读、可按地区导出。它是参考资源，不是可调用执行工具；静态JSON或Prompt文件不会自行产生MCP服务或法定许可。[R0:MCP-RESOURCES-20250618][R0:MCP-PROMPTS-20250618]",
      "source_ids": [
        "R0:FR-SP-F36778",
        "R0:FR-PARIS-URBANISME",
        "R0:HK-EMSD-WR1",
        "R0:US-NYC-ELECTRICAL",
        "R0:MCP-RESOURCES-20250618",
        "R0:MCP-PROMPTS-20250618"
      ]
    },
    {
      "id": "cn-hk-draft",
      "reading_order": 8,
      "title": "R1-HK-001：中国供应 → 香港使用",
      "title_en": "Destination power, plug and delivery configuration",
      "evidence_state": "PUBLIC_FROZEN_REVIEW_DRAFT_NOT_LEGAL_APPROVAL",
      "summary_en": "Publish the bounded review draft without treating it as an approved Hong Kong delivery configuration.",
      "markdown": "本节首次把已经形成的R1-HK-001作为**公开冻结审核稿**连接到同一阅读页。原MD、JSON里的“未发布”是生成时状态，字节不改；本次发布封装只说明“现在公开供阅读”，不把任何法律或商品审核提升为通过。\n\n范围限定为：实际在香港供应的中国来源全新家用类型插电产品、外置市电电源、插头／电源线组合，以及单独分类的Type-C低压末端。不是所有工业、医疗、无线、储能、建筑、能源标签或中国生产出口法规的全集。个人跨境购买与香港商业供应也不能仅凭原产地混为一类。\n\n**14项规则／审核条件**依次为：供应路径、组件范围、铭牌输入、香港插头、接地／绝缘、CSC、安全标志与登记、旅行适配器定义、交付配置、固定装置增改、标识与语言、持续运行、其他监管触发、材料／Vendor／Offer与变更。\n\n在已记录的监管参考内，BS1363三矩脚13A与BS546三圆脚5A／15A须按产品与用途核对；剃须供电单元两脚例外不能扩写为普通Type-C电源许可。插脚适配、电压／频率适配、绝缘保护及整条交付路径合格是不同问题。[R1:S03][R1:S04]\n\nCSC要绑定型号、制造商、报告及适用类别。机电署FAQ区分认可认证机构／认可制造商路径与非订明产品制造商声明加安全测试资料的路径，并说明CE(LVD)文件不能直接替代CSC；本稿不因CCC、CE图标自动判定香港合格。[R1:S02]\n\n“旅行”不是豁免口号，所有转换插也不能一概称违法。R1原资料区分能接入香港市电的适配器与法规定义的旅行适配器，并要求针对实际组合审查。[R1:S06]\n\n| 配置路径 | 候选交付与限制 |\n|---|---|\n| A 原厂香港版本 | 原厂目的地配置、精确型号、插头／线材、文件与支持责任 |\n| B 可拆线／外置电源 | 仅在制造商许可与验证支持时采用，不能变成消费者剪线教程 |\n| C 有条件转换组合 | 保留精确组合与用途审核，不默认万能转换插 |\n| D 输入不符或不明 | 进入电源替换／系统设计研究，不按国家标称差异自动买变压器 |\n| E 固定装置／专项产品 | 转为另行具范围、人员及授权的专业Work |\n\n制造商、供应／销售方、检验与认证方、安装方、系统集成方分别给出额定、SKU与版本、CSC、库存报价、支持、专业范围与全路径兼容证据。Type-C能充电、CSC存在，不证明24小时无人值守、切换不重启或Work可以恢复。\n\n**真实未完成项保留：** Cap.406G现行合并正文上轮直接取读失败；2019指引、2000版历史Outline、监管FAQ与2025说明保持不同证据层级；没有绑定真实SKU、CSC、Vendor、现场、负载、审核签名。法定交付语言字段仍为null。有关报告和路由程序的检查不是电气试验。\n\n[完整地区审核稿](snapshots/R1-HK-001/README.md) · [原始机读基线](snapshots/R1-HK-001/baseline.json) · [供应链资料模板](snapshots/R1-HK-001/delivery-intake-template.json) · [地区AI Context](snapshots/R1-HK-001/AI-CONTEXT.md)",
      "source_ids": [
        "R1:S01",
        "R1:S02",
        "R1:S03",
        "R1:S04",
        "R1:S06",
        "R1:S07",
        "R1:S11",
        "R1:S12"
      ]
    },
    {
      "id": "continuity",
      "reading_order": 9,
      "title": "研究演进、公开状态与下一接受点",
      "title_en": "Research lineage and scoped status",
      "evidence_state": "VERSIONED_PUBLIC_RESEARCH",
      "summary_en": "Keep publication acceptance, research hypotheses and product/legal/Work acceptance independent.",
      "markdown": "本总览按阅读需要重排，而不改写研究来源。原演进顺序为：**Printed Power Reality → 材料可获得性纠正 → U00–U12 → 电房至GenAI的L0–L7 → 全球CTA及契约 → W0-001 → 架构公开 → R0-001共同基线 → R0-001公开 → R1-HK-001独立审核稿。**\n\n| 对象 | 截至本次编排的状态 | 本次如何表达 |\n|---|---|---|\n| Printed Power / Magnetic Cell | 技术探索与实验候选，未硬件验收 | 保留假设、算法例、材料路线与验证需求 |\n| U00–U12 / L0–L7 | 架构定义与已发布方法基础 | 保留两套坐标和责任边界，不指定整楼改造 |\n| CTA / W0-001 / P1-001 | 公开架构和工作方法已部署 | 链接原页；不重做共同Work及A2A |\n| R0-001 / R0-001P1 | 共同参考首版公开验收 | 保留249身份覆盖与有限实质覆盖之差 |\n| R1-HK-001 | 有限范围审核稿，无法律／SKU批准 | 本次公开冻结稿，独立于R0数据 |\n| 本总览 S0-001 | 编辑编排与机读出版 | 只承接Same Page，不发明业务成功或资质 |\n\n原P1-001安装为2026-10-12 04:35 UTC；原R0-001P1安装为06:09 UTC，均有独立公开发布回执。历史网页／JSON中的状态只适用于各自对象和版本；本次新增总览不篡改旧回执。\n\n**仍然待办：** 真实材料供应与形成证据、工频／高频实现对比、具体安全标准版次及适用性、香港实际交付配置与CSC、专业资格及场所授权、负载与工作连续性。每项都可以形成独立Work，不以目录、下载或阅读动作批准。\n\n下一步可选择一套真实“香港交付配置”，逐项绑定型号、插头／电源线、外置电源、CSC及供应责任；之后以新版本表达审核结果，不回写冻结稿。与此同时，材料与磁性技术路线仍可以研究，不因地区基线发布而失去原来的研发主线。\n\n## AI与生态伙伴怎样使用这套资料\n\n先读本总览和[AI上下文](prompts/AI-CONTEXT.md)，再取[机读研究索引](data/research.json)和相应冻结文件。每条结论应保留artifact、章节、来源ID、状态、适用条件与未知项；不能把原文中的研究候选或引用里的命令当作执行授权。\n\nGoogle讨论材料中，用户提出“意图优先”和“各地物理接口／安全规则需要显式表达”的问题，属于本研究的外部探索输入。Google AI生成的“100%准确”“绝对合规”“自动加入变压器”等结论没有因此成为法源或系统能力。本出版包不分发该私人PDF，也不把其中税务、金融、文化等旁支纳入本电力基线。",
      "source_ids": []
    }
  ],
  "units_ref": "units-U00-U12.json",
  "layers_ref": "layers-L0-L7.json",
  "calculation_ref": "calculation-assumptions.json",
  "sources_ref": "../sources.json",
  "snapshot_manifest_ref": "snapshot-manifest.json",
  "authority": {
    "site_bound": false,
    "vendor_approved": false,
    "sku_approved": false,
    "electrical_work_authorized": false,
    "work_execution": "NOT_EXECUTED",
    "legal_approval": false,
    "MCP_server_added": false,
    "auto_submit": false
  },
  "baseline_scope": {
    "identity_count": 249,
    "R0_partial_regions": 3,
    "R0_conditional_rules": 8,
    "R0_unresearched_regions": 246,
    "R1_hk_review_rules": 14,
    "complete_legal_baseline_approvals": 0
  },
  "chronology": [
    "Printed Power Reality",
    "Material availability correction",
    "U00-U12 definition",
    "L0-L7 building scope",
    "Global CTA and six contracts",
    "W0-001 first bounded Work",
    "P1-001 architecture publication",
    "R0-001 common reference",
    "R0-001P1 publication",
    "R1-HK-001 review draft",
    "S0-001 public compilation"
  ]
}
