# HSIMC · GenAI Productive Ready
## Global Action 01 · Power Ready Infrastructure

**Research foundation:** Building-to-GenAI Power Reality Infrastructure · E0-002 (architecture candidate).  
**Kickoff artifact:** HRI-HSIMC-POWER-READY-GLOBAL-ECOSYSTEM-KICKOFF-C0-001.  
**Date:** 2026-10-12.  
**Status:** Authored public-entry and contract-foundation candidate. Not publicly deployed. Not a signed agreement, vendor qualification, product certification or electrical-work authorization.

## 1. 母定位

HSIMC remains the distributed GenAI-native capability production infrastructure. Power Ready Infrastructure is its first proposed **GenAI Productive Ready** action, not a replacement of HSIMC with a power-equipment retailer.

> Before devices can work, their power must be ready.
>
> 从大厦／小区电房，到 Type-C 入口与 GenAI 实际工作。先让一个地方具备稳定、持续、合规、可验证的供电条件，再确定可接入的设备、SKU、供应与服务。

“从供电开始”不是忽略负载：实际 Work 的持续功率、峰值、允许中断和恢复要求仍是工程输入。它是改变公开入口的组织方式，不再以某一个设备品牌或手机型号作为整套系统的起点。

> Global Manufacturing Readiness Begins with Material Availability, Not Factory Availability.
>
> 全球即时制造就绪的起点，是可获得的材料，而不只是可调用的工厂。

材料在当地存在、可以加工、工程验证通过、适用法规审查完成和获授权交付，是不同状态。不能因为铜箔、铜线或绝缘材料有货，就自动认定替代工艺或最终产品已经合格。

## 2. 网站入口安排（拟议，尚未部署）

- `/work/` 保留已有 Shared Task Continuity／A2A 工作流程，仅拟新增一个全球 Power Ready 行动 CTA。
- `/work/power-ready/` 是拟议的独立共建页面，连接 `/build/` 与 `/rd/`，而不是取代它们。
- 原有消费地区与语言入口保留；不要复制另一套 Runtime 身份。当前可下载预览只接受用户声明的地区文字，尚未绑定既有 249 地区 Runtime，不生成任何新地区 ID。
- 用户在预览中输入的意图只在本地处理。复制或导出后，由用户决定是否带入原有 Work。没有后台提交、供应商登记、报价、收款、物业访问授权或电力设备指令。

## 3. CTA 正文候选

**GENAI PRODUCTIVE READY · GLOBAL ACTION 01**

# Power Ready Infrastructure

**From the building power room to GenAI work.**

Bring a place, compliant professional capability, locally available material, a product, a sales or service point, or reproducible test evidence. Together, define the power conditions that let GenAI work continue—and identify who can lawfully form, supply, install, verify and support them in each jurisdiction.

从大厦／小区电房到设备终端，共同形成稳定、持续、合规且可验证的供电能力。我们邀请具备适用资质的电业专业人员、施工单位、材料供应商、制造商、门店及服务点、检测／检验／认证机构参与；以当地法规、材料可获得性、明确责任和真实证据，建立 SKU、Vendor、供应与兼容契约。

**CTA:** Bring a Site or Capability / 带入场所或能力。  
**Secondary CTA:** Review SKU & Vendor Foundation / 查阅契约基础。  
**Continuation:** Continue through the existing Work / 经原有 Work 接续。

**Public boundary:** Global by architecture. Local by evidence. Authorized by scope. Participation is not verified eligibility, an accepted listing, a signed contract or permission to perform electrical work.

## 4. Eight layers retained from E0-002

| Layer | Functional boundary |
|---|---|
| L0 | Utility interface / building or estate power room |
| L1 | Building main distribution |
| L2 | Floor and vertical distribution |
| L3 | Space power entry |
| L4 | Local isolation and power formation |
| L5 | Distribution, storage, redundancy and continuity |
| L6 | Type-C / PD terminal delivery and cable |
| L7 | Actual GenAI device Work and recovery |

These layers do not prescribe a voltage, transformer material, converter topology or device brand. They are not installation instructions and confer no access to building electrical infrastructure.

## 5. 六类互相连接的记录

| Record | Purpose | Essential fields |
|---|---|---|
| Work Power Profile | Work 需要什么供电条件 | reference measurement point; continuous / peak power; peak duration; permissible interruption; backup at stated load; recovery objective; environment; separate targets and measurements |
| Jurisdiction & Authority | 在哪里、适用什么规则、谁有权做 | installation, consumer, supply, provider, manufacturing and data-processing nexuses; subnational scope; current local requirements; language duties; permissions and role-specific eligibility |
| SKU / Service Contract | 交付什么及适用边界 | exact SKU and revision; hardware / firmware / BOM; materials and batch; process; qualification of substitutions; power envelope; derating; acceptance; warranty, recall and change control |
| Vendor Capability Contract | 谁承担哪些交付责任 | legal entity; business registration; role; applicable licence or accreditation; issuing body, number, grade, scope and validity; personnel; jurisdictions; authorized SKU versions; capacity, support and signatories |
| Supply Offer / Sales Point | 实際向谁买、在哪里、什么条件 | legal seller; location; exact SKU revision; stock and timestamp; price, currency, tax, validity, lead time; installation inclusion; aftercare, warranty and service location |
| Compatibility & Limits | 什么组合已被证明可用 | complete power path configuration; SKU and exact device HW/FW; workload; ambient conditions; duration; PD / electrical traces; switching / fault tests; limitations; unsupported conditions; evidence, reviewer and retest triggers |

A product may have several lawful sellers and offers, several regional installation providers, and multiple compatibility records. Do not merge stock, price, licence, certification, device compatibility and Work acceptance into one “approved vendor” flag.

## 6. 国家／地区层面的合规设计

Country identity is a reference, not a legal opinion. Installation location cannot automatically stand in for consumer, supply, contracting or data-processing jurisdiction. Local and subnational requirements must remain representable.

For each role and Work scope, record whether a specific registration or licence is required, the basis for that determination, the issuing regulator, grade/activity, validity, verification date and evidence. The default is **unknown/unreviewed**, not “not required.” Company registration is not an electrical-work licence. Supplier qualification does not authorize a particular site intervention.

Testing, inspection and certification roles must be kept distinct. An organization's accreditation applies to its stated activities; it is not automatic product certification. Product certification and protocol certification likewise do not establish full-path operating continuity for an arbitrary device or workload.

Official-language evidence remains separate from specific safety labels, manuals, contracts or consumer-service language duties. No 249-jurisdiction legal rules have been signed off under this kickoff.

## 7. 兼容清单从供电路径出发

Proposed relation:

`Power Profile Version × Complete Supply Path × SKU Revision × Device HW/FW × Workload × Environment × Test Duration / Fault Case → Evidence + Limits`

Public statuses: **NOT TESTED**, **TESTED WITH LIMITS**, **NOT SUPPORTED**, **ACCEPTED FOR A SPECIFIC WORK**.

Power compatibility, data connectivity and Runtime/Work continuity must be separate fields. A Type-C connector, brand name, charging indicator or historical report cannot by itself support a universal “GenAI Ready” claim. Expired qualifications and materially changed hardware, firmware, components, cables or source paths trigger re-evaluation as relevant to the claim.

The current accepted Vendor, SKU, active Offer and accepted Compatibility directories are deliberately empty. They are not fictitious launch partners or approved products.

## 8. 经济与责任边界

Material supply, manufacturing, design, installation, testing, certification, sales, maintenance and supervision are distinct contributions. Agreements must specify the actual contracting party, deliverables, conditions, fees, payment, warranty, recovery support, change notices, subcontractor responsibility, confidentiality, IP/licensing and dispute/liability terms as appropriate. The machine-readable foundation organizes these matters; it does not replace local legal review or constitute a signed agreement.

The ecosystem can therefore support research and material contributions before a complete product exists, while refusing to mark unqualified field work or untested hardware as deployable.

## 9. 首个可接续行动

A bounded first Work can be **Power Readiness Baseline & Gap Map**: define one lawful site and a target workload, document existing supply and materials, identify unverified boundaries and missing capabilities, then assign each gap to a qualified contribution and acceptance plan. Any opening, testing or modification of fixed electrical equipment remains subject to separate local professional and site authorization.

The first business deliverable is a scoped assessment, design, supply, verification or deployment package with named responsibility—not an unconditional claim to upgrade a whole building or power every device.

## 10. Sources and their limited purpose

1. Existing HSIMC common Work / A2A entry: https://hsimc.tech/work/
2. Existing HSIMC mother positioning: https://hsimc.tech/
3. Hong Kong government electrical worker grade/scope guidance: https://www.1823.gov.hk/en/faq/how-are-registered-electrical-workers-graded-what-qualifications-are-required-for-each-grade-what-kind-of-electrical-works-can-be-conducted-by-the-workers-of-the-respective-grades
4. Government notice on registered electrical contractors: https://www.isd.gov.hk/eng/tvapi/20_eg94.html
5. HOKLAS scope and current-status directory: https://www.itc.gov.hk/en/quality/hkas/conformity_assessment_bodies/hoklas.html
6. HKCAS scope and current-status directory: https://www.itc.gov.hk/en/quality/hkas/conformity_assessment_bodies/hkcas.html
7. USB-IF product listing and scope/recency explanation: https://www.usb.org/products

Sources were consulted for architecture and verification-path examples on 2026-10-12. No source consultation here verifies an individual professional, organization, SKU, site or installation.

## 11. 实际工程状态

The deliverable includes a self-contained authored HTML preview, JSON contract foundation, source register, draft CTA component and this specification. **51 local JavaScript logic assertions passed**, and static HTML checks verified unique element IDs, no external scripts, no form-submission elements and the two authored inline CSP hashes.

Full browser/visual acceptance did not complete: the container browser refused `file://` navigation. No browser policy was altered. A later remote read was blocked by tool safety checks; it was not retried or bypassed. The existing 249-directory binding, remote build, production integration and public HTTP/browser acceptance are **not completed**. No production file was written in this turn.