HSIMC · UN Six-Language White Paper · P6 / W0-017

Appendix F - Evidence Register and Source Notes

F.1 Internal evidence register

H0-001 / 2026-11-11 - Cross-Project Hand Off

Evidence class: Documented handoff

Boundary: Consolidates prior decisions/evidence; did not re-probe physical T736 or deploy firmware/device.

C0-005 / 2026-11-09 - T736 hardware standardization baseline

Evidence class: Documented

Boundary: Supplier-document review, pin/interface mapping and conflicts; no new bench measurement.

C0-006 / 2026-11-09 - Remote engineering plan

Evidence class: Planned architecture

Boundary: Cloud simulation -> remote reference board -> freeze -> ship -> local bind/accept.

C0-007 / 2026-11-10 - Source-verified simulator

Evidence class: Simulated

Boundary: Simulator source and receipts; physical targets return unbound; does not prove hardware.

C0-008 / 2026-11-10 - Recorded Azure remote simulation

Evidence class: Remote simulated

Boundary: 14/14 recorded remote simulation checks; real 736 was unreachable in that record.

W0-003 / P1 - Invitation Card + One-Page Brief

Evidence class: Published digital

Boundary: Digital publication/QR checks completed; physical print/NFC read-back deferred.

W0-004 / P2 - Executive Summary

Evidence class: Published digital

Boundary: English summary HTML/PDF published and verified.

W0-005 / P3-A - Part I

Evidence class: Published digital

Boundary: English Part I published and verified.

W0-006 / P3-B - Part II

Evidence class: Published digital / current known public baseline

Boundary: English Part II published and verified.

W0-007 / P3-C - Part III

Evidence class: Generated and archived

Boundary: Digital publication package prepared; remote deployment deferred.

W0-008 / P3-D - Part IV

Evidence class: Generated and archived

Boundary: Digital publication package prepared; remote deployment deferred.

W0-009 / P3-E - Part V

Evidence class: Generated and archived

Boundary: Digital publication package prepared; remote deployment deferred.

W0-010 / P3-F - Part VI

Evidence class: Generated and archived

Boundary: Digital publication package prepared; remote deployment deferred.

W0-011 / P4 - English Master Consolidation

Evidence class: Generated master

Boundary: Consolidates Parts I-VI plus front matter, Appendices A-H, glossary, source and version registers.

F.2 Evidence labels

F.3 Observation versus receipt

An operation receipt is evidence about a specific operation. A fresh observation is evidence about a current or recent state. The evidence object should carry observation time, receipt time, source, method, version and freshness limit so that a historical receipt is not silently treated as current state.

F.4 Source hierarchy

When evidence conflicts, preserve the conflict rather than silently reconciling it. A practical hierarchy is current physical measurement for the bound instance; current manufacturer/BOM-specific data; versioned engineering documentation; simulator behavior; design proposal. Different sources may answer different questions and therefore should not be forced into a single value without explanation.