Input contract / 输入
Rated supplies; load/inrush profile; backup and connectors额定电源、负载浪涌、备用与接口
CASE-LEVEL KICKOFF · C0-001 · 2026-10-09
T736-ECO-026 · F08 · REFERENCE_COMPONENT_SKU
Make the full device and peripheral load supportable支撑整机与外设真实负载
Rated supplies; load/inrush profile; backup and connectors额定电源、负载浪涌、备用与接口
Checked power arrangement and outage behavior核验供电组合与断电行为
Voltage/current/polarity; peak load; safe disconnect; restart effects电压电流极性、峰值、安全断开、重启影响
Target specified; not executed in this composition.
Power supply; energy; backup; test电源、能源、备用、测试
Supplier, price, capacity and validity: unknown / 未绑定。Price unknown is not free.
These are conditional interfaces, not a mandatory serial execution graph. A combination needs only its relevant conditions, but none may be silently omitted.
| Dimension | State |
|---|---|
| definition | PUBLISHED_REFERENCE |
| implementation | NOT_ASSERTED_BY_DIRECTORY |
| current_instance | UNBOUND_NOT_ASSESSED |
| execution_authority | NONE |
| acceptance | NOT_RUN_FOR_THIS_COMPOSITION |
Historical evidence stays scoped to its original device, method and time. This page does not report a new live probe.
Source references: SRC-2023 SRC-DESIGN SRC-BOARD SRC-LEGACY
hsimc://t736/ecosystem/sku/T736-ECO-026
Proposed resource URI for an adapter. Not served by an active MCP server. The HTTPS JSON above is the actual public file.
Before an instance or supplier is bound, specify exact version, input profile, site/time, access rules, test result and an accepted economic offer. / 在绑定实例或供应商之前,补足确切版本、现场时段、权限、测试与接受的经济条件。
This public directory defines reference components, inputs, outputs and acceptance targets. It does not grant execution authority, bind a Runtime, create a vector database, activate an MCP endpoint, reserve a supplier or accept an order. 目录不等于已验证的整套系统;当前实例、权限、可用时间和交付均需各自证据。