HSIMC · MCP-NATIVE CONSUMPTION & PRODUCTION · 28 JULY 2026 — THE STATELESS MCP TURNING POINT

Milestone #3 · B02 batch C0-002

Ideas to Design Work

Two new customer-specific design concept paths and one existing review concept, each grounded in a dated historical example rather than a student identity.

Review boundary: Seven historic B02 records were examined. Three support concept previews (including an existing published concept); four are resource links, training or tool evidence needing separate follow-up. These are not seven approved, stocked, manufactured or priced products.

Existing B02 design review: B02-004 · original C0-009 reference #269.

The planning-stage umbrella is not a tested wind-rated or typhoon-safe product. The portable study-space is a concept requiring any physical making and safety checks to be scoped separately. No real payment, checkout, NFC tag or product order has been activated.